Open
2WO-2040
Critical
Motor overheating — 4th occurrence. Machine offline. Root cause analysis required.
Apex Fabricators
Sandra Liu
Apr 30, 2026 at 07:00
Critical priority
WO-2037
Normal
Pump seal failure — third occurrence. Must be serviced in 2am–6am window.
Clearfield Foods
James Torres
May 5, 2026 at 02:00
Scheduled
3WO-2038
High
Cable tension repeat issue. Engineering review + load line replacement.
Summit Construction
Priya Mehta
May 2, 2026 at 06:30
WO-2035
Low
Annual OSHA forklift inspection.
Riverstone Logistics
Marcus Webb
May 8, 2026 at 10:00
WO-2034
Normal
Quarterly PM: filter replacement, belt tension check, separator element.
Apex Fabricators
Sandra Liu
May 12, 2026 at 07:30
In Progress
1WO-2041
High
Semi-annual PM service due. Engine oil dark, brake check required.
Riverstone Logistics
Marcus Webb
Apr 30, 2026 at 08:00
Completed
1WO-2039
Normal
Semi-annual HVAC inspection: coils, refrigerant, drains.
Metro Warehousing
Tyler Oakes
Apr 29, 2026 at 09:00
Invoiced
1WO-2036
Normal
500-hour PM service. Pre-warranty expiration inspection.
Summit Construction
Priya Mehta
Apr 25, 2026 at 08:00